News


Fast Pace Turnkey Solution for Nordana

From Septemper 2015 to January 2016, DESMI Ocean Guard prepared and installed a RayCleanTM 300 system along with a wide range of associated components under difficult and time pressured circumstances.

The turnkey solution involved a thorough ship inspection in Italy , 3D scanning in Norway, engineering, manufacturing and installation of the tailored components,  class approval, delivery and installation of loose components in China and handover in Singapore. This project quickly evolved and when the need for flexibility emerged, DESMI Ocean Guard managed to beat the usual production time.

 

Download PDF of the Case Story

BWTS 1 Installation BWTS BWTS Branttingsborg RayClean BWTS

 

Related news


To the top

Join DESMI at Posidonia 2020, 26-30 October

The International Shipping Exhibition taking place 26-30 October, 2020 in Athens, Greece at the Metropolitan Expo

I’m interested. Tell me more

Join DESMI at SMM, 2-5 February 2021

The leading international maritime trade fair SMM is taking place February 2-5, 2021 in Hamburg, Germany at Hamburg Messe + Congress

I’m interested. Tell me more

Ultimate Web A/S

We use cookies to enhance our website and improve your experience of it. If you continue to use our website, you accept the use of cookies.

Read More
OK