News


Fast Pace Turnkey Solution for Nordana

From Septemper 2015 to January 2016, DESMI Ocean Guard prepared and installed a RayCleanTM 300 system along with a wide range of associated components under difficult and time pressured circumstances.

The turnkey solution involved a thorough ship inspection in Italy , 3D scanning in Norway, engineering, manufacturing and installation of the tailored components,  class approval, delivery and installation of loose components in China and handover in Singapore. This project quickly evolved and when the need for flexibility emerged, DESMI Ocean Guard managed to beat the usual production time.

 

Download PDF of the Case Story

BWTS 1 Installation BWTS BWTS Branttingsborg RayClean BWTS

 

Related news


To the top

Join DESMI at SMM 2018

SMM is the world’s leading trade fair for the maritime industry taking place the 4-7 of September 2018, in Hamburg, Germany. Locate DESMI at the Danish Pavilion stand nr. B1.EG.310¨.

I’m interested. Tell me more

Join DESMI at Euronaval 2018

The world meeting of naval technologies for the future taking place October 23-26 in Paris Le Bourget.

I’m interested. Tell me more

Ultimate Web A/S

We use cookies to enhance our website and improve your experience of it. If you continue to use our website, you accept the use of cookies.

Read More
OK